Discussion Questions:
1. The discussion of the framework for manufacturing planning and control seems to imply that
overall direction setting must be done before detailed material and capacity planning activities
can be accomplished. The latter must be done before executing and controlling the plans is
possible. Do you agree? Give an example supporting your position.
2. Apply the MPC framework to a college setting. In particular, Identify the front end, engine,
and back end.
3. We have suggested that as changes take place in the world, the MPC system would require
modifications to adapt. What changes can you see that will require changes in the MPC system?
4. One of the local company's production managers asked you to advise her on installing an
MPC system. She starts by asking you which particular software brand you prefer and if you
believe in ERP systems. What questions would you ask her?
Quiz Questions:
1. In the MPC process, capacity decisions (equipment, facilities, suppliers, etc.) are most likely
to occur in what time horizon?
2. In the MPC process, detailed scheduling decisions are most likely to occur in what time
horizon?
3. Master Production Scheduling (MPS) and Resource Planning are a part of which MPC
phase?
4. Measurement and Control are a part of which MPC phase?
5. Products that are part of a one-time production process (e.g., bridges or aircraft carriers)
would most likely use which form of MPC?