You are preparing a one-line electrical drawing for a grid-tied PV system with battery backup, which of
the following is the right components order (starting from PV modules and ending at the utility Grid):
O Inverter-disconnect-meter-PV array-battery
O PV array-disconnect-inverter-meter-battery
O PV array-battery-inverter-disconnect-meter
O PV array-battery-meter-inverter-disconnect
Question 6
The Installer is responsible for:
1 pts
O Inspect PV system for code compliance
1 pts
Designing the PV system according to the local and national standards
Installing PV system according to the local and national standards
O Designing the PV system according to the local and national standards AND Installing PV system according to
the local and national standards
Fig: 1