Question 5

You are preparing a one-line electrical drawing for a grid-tied PV system with battery backup, which of

the following is the right components order (starting from PV modules and ending at the utility Grid):

O Inverter-disconnect-meter-PV array-battery

O PV array-disconnect-inverter-meter-battery

O PV array-battery-inverter-disconnect-meter

O PV array-battery-meter-inverter-disconnect

Question 6

The Installer is responsible for:

1 pts

O Inspect PV system for code compliance

1 pts

Designing the PV system according to the local and national standards

Installing PV system according to the local and national standards

O Designing the PV system according to the local and national standards AND Installing PV system according to

the local and national standards